Mill Theatre – Dundrum Town Centre

The Mill Theatre was constructed as part of the Dundrum Town centre development. With an area of 1,200m2, the building consists of a 200-seat theatre and associated backstage area and green room, rehearsal studio, dressing rooms and basement bar, all located below ground level. The reception and lobby area are located at ground level. The theatre was opened in May 2006.

Client:

Crossridge Investments Ltd.

Start/End Date:

2000 – 2006

Contract Value:

€10M

Role:

Structural & Civil Engineers

Key Features:

  • Up to 8m high RC Basement Wall construction
  • Theatre structure designed to minimise vibration and enhance acoustics
  • Composite steel frame and concrete slab on metal decking
  • RC in-situ pad foundations

Find out more about our Structural Engineering services.

This site uses session cookies, we do not store user data. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close